What you'll need to show after 30 December, and who will ask

From 30 December, EUDR proof is checked at customs and by competent authorities. What each one looks at, what a complete file holds, and how to get there.

Black filled circle on a white background.
Article

What you'll need to show after 30 December, and who will ask

A coffee importer in Hamburg placed an order with a Brazilian exporter in October. The beans were harvested months ago. The ship leaves Santos in December and docks in early January.

‍

Nothing about that shipment feels like an EUDR problem today. It was ordered before the regulation applied. But it will be released into the EU after 30 December, and the law looks at when goods are placed on the market, not when they were bought.

‍

That is the first of two moments when EUDR stops being a project and becomes a question someone else asks. The second comes later, and with less warning.

‍

Short answer: From 30 December 2026, large and medium operators must have a due diligence statement before relevant goods are placed on the EU market or exported. Proof is checked in two places. Customs needs the statement's reference number before it releases the goods. Competent authorities check operators afterwards, without prior warning as a rule, and look at both the due diligence system and the records behind specific statements. There is no grace period in the final text.

‍

Moment one: at the border

Short answer: Under Article 26(4), the reference number of the due diligence statement, or the declaration identifier for a micro or small primary operator, must be made available to customs before relevant goods are released for free circulation or exported. The person lodging the customs declaration provides it.

‍

Three practical consequences follow from that one sentence.

  • Your customs broker needs the number. Until the electronic link between national customs systems and the EU information system is in place (the regulation sets 1 December 2029), the reference number goes into the customs declaration itself. Whoever lodges the declaration, often a broker or forwarder, has to have it before the goods arrive.
  • The code has to match the case. The Commission publishes TARIC document codes for EUDR, updated in September 2026. A filed due diligence statement is declared under code C716 and a simplified declaration under C717, with other codes covering specific situations such as re-imports. Brokers will ask which applies.
  • Customs can hold goods. If a product has been flagged for a check, Article 26(7) requires customs to suspend its release.

‍

The timing trap is the one in the opening example. Goods ordered weeks before 30 December can arrive after it. For those shipments, the statement has to exist before the goods reach the border, which means the plot data behind it has to exist even earlier.

At the border, customs works from the reference number and the status the information system returns for it. Examining the due diligence behind the statement is the competent authority's job. That comes next.

‍

Moment two: at the inspection

Short answer: Competent authorities in each member state check operators, large downstream operators and large traders using a risk-based approach. Checks are carried out without prior warning unless notice is needed for the check to work, and authorities may pick specific due diligence statements to examine.

‍

The regulation sets minimum check rates per year: at least 1% of the relevant companies for products from low-risk countries, 3% for standard-risk countries, and 9% of companies plus 9% of the quantity of each product for high-risk countries (Article 16). The targets apply separately to each commodity.

What an inspector looks at

For operators, Article 18 sets out what a check must include:

  • The due diligence system itself, including the risk assessment and risk mitigation procedures, and the documents and records showing that the system works
  • The file behind a specific product: the documents and records showing that it complies, including any risk mitigation applied, and the due diligence statement for it

‍

Where those raise questions, the authority can go further: on-the-ground examination of goods, checks of corrective measures, species or origin testing such as DNA analysis, Earth observation data such as Copernicus imagery, and spot checks or field audits, including in third countries where they agree.

‍

For downstream operators and traders, Article 19 is narrower. The check examines the records they must keep: who supplied them, who they supplied, and, for the first company after the operator, the statement reference numbers.

‍

Notice what the operator check asks for. Not a certificate or a score, but the system and the records behind a particular statement. An inspector can pick one statement and examine the records behind it.

What follows a finding

If an authority finds non-compliance, Article 24 requires it to order corrective action within a set period. That includes at least one of: fixing a formal non-compliance, stopping the product from being placed on the market, withdrawing or recalling it, or donating or disposing of it. The company must also fix the shortcomings in its due diligence system.

‍

Penalties are set by each member state under Article 25. For legal persons, the maximum fine must be at least 4% of total annual EU-wide turnover, and penalties include confiscation of the products and of the revenue from them.

‍

National laws are now arriving. On 12 November 2026 the German Bundestag passed the act implementing the regulation. It names the Federal Office for Agriculture and Food (BLE) as the competent authority and provides for fines of up to €100,000, or up to 4% of EU-wide turnover for larger companies under certain conditions, alongside criminal penalties. It still has to complete the legislative process before it applies.

‍

What a complete file looks like

Short answer: For each due diligence statement, an operator should be able to produce the information the regulation required it to collect, the record of how it assessed and handled risk, the statement itself, and evidence that its due diligence system works. Operators must keep their statements for five years from submission.

‍

In practice, the file behind one statement draws on:

  • The Article 9 information: product description and HS code, quantity, country of production, the geolocation of every plot and the date or time range of production, and the suppliers and customers involved
  • Deforestation evidence: adequately conclusive and verifiable information that the plots weren't deforested after 31 December 2020
  • Legality evidence: adequately conclusive and verifiable information that the commodity was produced in line with the relevant laws of the country of production
  • The risk decision: the risk assessment and any mitigation, or, where all inputs come from low-risk countries, the basis for using simplified due diligence
  • The statement and its reference number, and the link from that statement to the shipment it covered
  • Records showing the system works: the documentation Article 18(1)(a) refers to, such as who reviewed what, when and on what basis

‍

For downstream operators and traders, the file is lighter: supplier and customer details for five years and, for the first company after the operator, the reference numbers. It still has to be producible on request.

‍

Six weeks: a working checklist

  1. List the shipments that arrive after 30 December. Include orders already placed. Those are the first statements you'll need.
  2. Confirm your role and date for each product line. Operator, downstream operator or trader, and whether you're on 30 December 2026 or 30 June 2027.
  3. Get the plot data and documents for those shipments first. Geolocation, production dates, legality evidence.
  4. Agree the hand-off with your customs broker. Who provides the reference number, by when, and which document code applies.
  5. Register in the EU information system if you haven't. Operators file statements there, and large downstream operators and traders must register before trading.
  6. Organize the file per statement, so that any one of them can be pulled together on request.
  7. If you're downstream, set up the records: supplier and customer details, and reference numbers if you're first after the operator.

‍

How Orbify helps put the file together

In November 2026 Orbify added evidence packs, built for the moment an authority asks what you hold.

  • Five levels. A pack can be requested for a supplier, a plot, a shipment, a purchase order or a statement, from the Download menu wherever that item is listed.
  • What's inside. A readable summary, a manifest, plot geometries, the audit trail, assessment reports and plot PDFs, and the documents on file, grouped by type. Shipment and purchase order packs also carry the statements filed for them.
  • Gaps are named, not hidden. Anything the platform couldn't include is listed in the manifest rather than failing the pack, so there's always something to hand over and a clear view of what's missing.
  • Built in the background. Large packs take a while, so the download link is sent by email.

‍

None of this replaces the due diligence itself. It makes the record of it easier to keep and easier to hand over.

‍

Orbify | Evidence Pack

‍

Key takeaways

  • From 30 December 2026, large and medium operators need a due diligence statement before goods are placed on the market or exported. There is no grace period.
  • Customs needs the reference number before releasing relevant goods, and can suspend release if a product is flagged for a check.
  • Competent authorities check at least 1%, 3% or 9% of companies a year, depending on country risk, usually without prior warning.
  • An operator check covers the due diligence system and the records behind specific statements.
  • Findings lead to corrective action, and fines for legal persons must be able to reach at least 4% of EU-wide turnover.
  • Orders already placed may arrive after 30 December and need statements.

‍

FAQ

Is there a grace period for EUDR after 30 December 2026?

No. The final text of Regulation (EU) 2025/2650 set new application dates without a grace period. A six-month grace period proposed during negotiations was dropped.

‍

What does customs need for EUDR goods?

The reference number of the due diligence statement, or the declaration identifier of a micro or small primary operator's simplified declaration, before the goods are released for free circulation or exported. The person lodging the customs declaration provides it.

‍

How often will companies be inspected under EUDR?

Each member state must check at least 1% of relevant companies a year for products from low-risk countries, 3% for standard-risk countries and 9% for high-risk countries, where 9% of product quantities are also checked. Selection is risk-based.

‍

What do EUDR inspectors check?

For operators, the due diligence system, including risk assessment and mitigation procedures, and the records and due diligence statement behind specific products. They may also use field checks, laboratory testing and satellite imagery. For downstream operators and traders, the supplier and customer records they must keep.

‍

What happens if an inspection finds a problem?

The authority orders corrective action within a set period, such as withdrawing or recalling the product, and the company must fix its due diligence system. National penalties can also apply, including fines and confiscation.

‍

How long do EUDR records have to be kept?

Operators keep their due diligence statements for five years from submission. Downstream operators and traders keep their supplier and customer information for at least five years.

‍

The file is the compliance

For most of the last three years, EUDR has been something companies prepared for. After 30 December it becomes something they're asked about, first by a customs broker who needs a number, later by an inspector who picks one statement and wants to see what's behind it.

‍

Neither question can be answered in the moment. The reference number has to exist before the goods arrive. The records an inspector examines have to exist before the inspector does. What a company can show on the day is whatever it built in the weeks before.

‍

The work that remains is concrete. Find the shipments that land after the deadline, get the plot data behind them, agree the hand-off with your broker, and make sure each statement has a file you could hand over tomorrow.

‍

If you'd like to see where your own file stands, our free EUDR assessment goes through your products, suppliers and plots in one call or request a free trial.

‍

Sources

‍

‍

Black filled circle on a white background.
Overview

See Orbify in action ?

Orbify monitors vegetation threats, climate risks, and infrastructure changes across your entire network — so you can prevent outages, optimize maintenance, and stay compliant.

Start with a 4-week pilot on your priority corridors. No enterprise contracts. No multi-month implementations. Just results you can verify against field data.

Topographic 3D map of Uzbekistan showing elevations with shaded relief and location pointers for Tashkent, Namangan, Samarkand, Bukhara, and Karshi.